Research programme

Three research work packages follow solar power from the PV park, through the plant, to the power system. Three more organise training, impact and management.

01 Structure

How the six work packages fit

The research is organised as a path:

  • Work package 1 looks inside the PV park.
  • Work package 2 looks at the plant and its connection to the grid.
  • Work package 3 looks at the power system as a whole.

Results move along the path. A new park architecture changes what the plant controller can do, and the plant’s behaviour changes how the system can be operated.

A three-dimensional model of the six work packages. Programme management (WP6) is the base slab. The three research work packages stand on it in a row: WP1, WP2 and WP3, with results flowing from each to the next. The training programme (WP4) is a dashed track that loops around all three and feeds each of them. Dissemination, communication and exploitation (WP5) is a ring around the whole model: results leave the research blocks and land on it.

  • WP1 · Innovative park architectures. How PV parks are built: the arrangement of modules, converters and on-site storage inside the park.
  • WP2 · Grid-centric plant control. How a PV plant is controlled so that it supports the grid it connects to, not only delivers energy into it.
  • WP3 · Effective system integration. How many PV plants work together with wind, storage, electric vehicles and conventional generation in one power system.
  • WP4 · Training programme. The network-wide training: six training weeks, secondments, career development and the open training library.
  • WP5 · Dissemination, communication and exploitation. Sharing results with researchers, industry, policymakers and the public, and taking them into practice.
  • WP6 · Programme management. Running the network: governance, reporting, recruitment, quality and ethics.

How the six work packages fit together. Research (WP1–3) stands on programme management (WP6) and is fed by the training programme (WP4); its results flow out through dissemination and exploitation (WP5). Point at a part to read its summary.

  1. WP1 Innovative park architectures (Park line)
  2. WP2 Grid-centric plant control (Plant line)
  3. WP3 Effective system integration (Grid line)
  4. WP4 Training programme (Training line)
  5. WP5 Dissemination, communication and exploitation (Coordination line)
  6. WP6 Programme management (Coordination line)

02 Research

Research work packages

Each section opens on the part of the power system that the work package studies, then lists its doctoral projects.

Work package 1: Innovative park architectures

How PV parks are built: the arrangement of modules, converters and on-site storage inside the park.

Line
Park
Lead
TuDo
Co-lead
UPAT
Projects
5 doctoral projects

A close three-dimensional view of the PV park in the power-system model. Three strings of PV modules feed DC/DC converters and a DC bus, with a battery on the DC side. The plant and the grid are drawn faintly beyond it.

  • Sunlight: the energy source. The park's output rises and falls with it through the day.
  • PV modules: they turn sunlight into direct current (DC).
  • DC/DC converter: it sets each string's operating point to harvest the most power, and matches the park's DC bus.
  • On-site storage: a battery on the park's DC side that can absorb or release energy.

The park in the power-system model: strings of PV modules, DC/DC converters, the DC bus and on-site storage. Point at a part to see what it does.

Doctoral projects in WP1

  1. DC4

    Doctoral project 4 — title to be confirmed Sample

    Host TBC

    Status Planned

  2. DC8

    Doctoral project 8 — title to be confirmed Sample

    Host TBC

    Status Planned

  3. DC9

    Doctoral project 9 — title to be confirmed Sample

    Host TBC

    Status Planned

  4. DC14

    Doctoral project 14 — title to be confirmed Sample

    Host TBC

    Status Planned

  5. DC15

    Doctoral project 15 — title to be confirmed Sample

    Host TBC

    Status Planned

Work package 2: Grid-centric plant control

How a PV plant is controlled so that it supports the grid it connects to, not only delivers energy into it.

Line
Plant
Lead
INESC TEC
Co-lead
UPC
Projects
5 doctoral projects

A close three-dimensional view of the plant in the power-system model. Two inverters, coordinated by a plant controller, feed a transformer. The park and the grid are drawn faintly on either side.

  • Inverter: it turns the park's direct current into alternating current at grid frequency.
  • Plant controller: it coordinates the inverters so the whole plant responds to the grid as one unit.
  • Transformer: it steps the plant's voltage up to the level of the transmission grid.

The plant in the power-system model: inverters, the plant controller that coordinates them, and the transformer. Point at a part to see what it does.

Doctoral projects in WP2

  1. DC1

    Doctoral project 1 — title to be confirmed Sample

    Host TBC

    Status Planned

  2. DC5

    Doctoral project 5 — title to be confirmed Sample

    Host TBC

    Status Planned

  3. DC6

    Doctoral project 6 — title to be confirmed Sample

    Host TBC

    Status Planned

  4. DC7

    Doctoral project 7 — title to be confirmed Sample

    Host TBC

    Status Planned

  5. DC13

    Doctoral project 13 — title to be confirmed Sample

    Host TBC

    Status Planned

Work package 3: Effective system integration

How many PV plants work together with wind, storage, electric vehicles and conventional generation in one power system.

Line
Grid
Lead
UNIPD
Co-lead
ICL
Projects
5 doctoral projects

A close three-dimensional view of the grid in the power-system model. A busbar is shared with wind, storage, electric vehicle charging and conventional generation, and a transmission line leads away to the European grid. The park and the plant are drawn faintly beside it.

  • Busbar: the connection point where many plants and loads meet.
  • Wind generation: another variable renewable source sharing the grid.
  • Grid storage: it charges when there is surplus solar power and discharges when it is needed.
  • EV charging: a growing, flexible load on the power system.
  • Conventional generation: thermal and hydro plants that still supply power and stability.
  • Transmission line: power leaves the busbar for the wider European grid.

The grid in the power-system model: a busbar shared with wind, storage, EV charging and conventional generation, and the line to the European grid. Point at a part to see what it does.

Doctoral projects in WP3

  1. DC2

    Doctoral project 2 — title to be confirmed Sample

    Host TBC

    Status Planned

  2. DC3

    Doctoral project 3 — title to be confirmed Sample

    Host TBC

    Status Planned

  3. DC10

    Doctoral project 10 — title to be confirmed Sample

    Host TBC

    Status Planned

  4. DC11

    Doctoral project 11 — title to be confirmed Sample

    Host TBC

    Status Planned

  5. DC12

    Doctoral project 12 — title to be confirmed Sample

    Host TBC

    Status Planned

03 Support

Supporting work packages

Training feeds the research, dissemination carries it out of the network, and management holds it together.

  1. Work package 4: Training programme

    The network-wide training: six training weeks, secondments, career development and the open training library.

    Line
    Training
    Lead
    UPC
    Co-lead
    UoS
    Training programme
  2. Work package 5: Dissemination, communication and exploitation

    Sharing results with researchers, industry, policymakers and the public, and taking them into practice.

    Line
    Coordination
    Lead
    ICL
    Co-lead
    TuDo
    Outputs
  3. Work package 6: Programme management

    Running the network: governance, reporting, recruitment, quality and ethics.

    Line
    Coordination
    Lead
    UoS
    Co-lead
    UH
    Governance